Energy Advisor
Adams-Columbia Electric Coop · Flat rate

What does Adams-Columbia Electric Coop Schedule GS (Rate Codes: 21, 23, DF) General Single-Phase, Farm and Residential (1) cost per kWh?

Schedule GS (Rate Codes: 21, 23, DF) General Single-Phase, Farm and Residential (1) from Adams-Columbia Electric Coop is a flat-rate plan: every kWh costs the same ($0.10/kWh) regardless of time of day or total usage.

Highest rate

11¢/kWh

Lowest rate

11¢/kWh

Fixed charge

$30.86/mo

Flat rate

$0.10/kWh

Frequently asked questions

What does Adams-Columbia Electric Coop Schedule GS (Rate Codes: 21, 23, DF) General Single-Phase, Farm and Residential (1) cost per kWh? +

Schedule GS (Rate Codes: 21, 23, DF) General Single-Phase, Farm and Residential (1) from Adams-Columbia Electric Coop is a flat-rate plan: every kWh costs the same ($0.10/kWh) regardless of time of day or total usage.

Who offers Schedule GS (Rate Codes: 21, 23, DF) General Single-Phase, Farm and Residential (1)? +

Schedule GS (Rate Codes: 21, 23, DF) General Single-Phase, Farm and Residential (1) is a residential electricity plan from Adams-Columbia Electric Coop (Adams-Columbia Electric Coop).

About this data

Compiled by Optiwatt from the OpenEI U.S. Utility Rate Database (539fb8d3ec4f024bc1dc1bbb). Representative — verify exact prices on your Adams-Columbia Electric Coop bill or tariff sheet.

Are you on the cheapest Adams-Columbia Electric Coop plan?

Ask the free Energy Advisor about Schedule GS (Rate Codes: 21, 23, DF) General Single-Phase, Farm and Residential (1), or upload a bill right here to check your real usage against every Adams-Columbia Electric Coop plan.

More free energy tools

Data last updated June 18, 2026. Compiled by Energy Advisor from published utility tariffs.