How do Lagrange County Rural E M C Rate Schedule GS2, Campground Lot tiered rates work?
Rate Schedule GS2, Campground Lot from Lagrange County Rural E M C is a tiered plan: the price per kWh steps up as monthly usage rises. The first tier is about $0.22/kWh; usage above the baseline allowance is billed at higher tiers.
Highest rate
22¢/kWh
Lowest rate
22¢/kWh
Fixed charge
$25.00/mo
Usage tiers
| Tier | Up to | $/kWh |
|---|---|---|
| Tier 1 | 100 kWh | $0.22 |
| Tier 2 | no limit | $0.10 |
Frequently asked questions
How do Lagrange County Rural E M C Rate Schedule GS2, Campground Lot tiered rates work? +
Rate Schedule GS2, Campground Lot from Lagrange County Rural E M C is a tiered plan: the price per kWh steps up as monthly usage rises. The first tier is about $0.22/kWh; usage above the baseline allowance is billed at higher tiers.
Who offers Rate Schedule GS2, Campground Lot? +
Rate Schedule GS2, Campground Lot is a residential electricity plan from Lagrange County Rural E M C (Lagrange County Rural E M C).
About this data
Compiled by Optiwatt from the OpenEI U.S. Utility Rate Database (55e9db5d5457a32a4b8e8005). Representative — verify exact prices on your Lagrange County Rural E M C bill or tariff sheet.
Are you on the cheapest Lagrange County Rural E M C plan?
Ask the free Energy Advisor about Rate Schedule GS2, Campground Lot, or upload a bill right here to check your real usage against every Lagrange County Rural E M C plan.
Drop your bill to upload
More free energy tools
Data last updated June 18, 2026. Compiled by Energy Advisor from published utility tariffs.