Energy Advisor
Lumbee River Elec Member Corp · Tiered

How do Lumbee River Elec Member Corp A-2: Single Phase General Service tiered rates work?

A-2: Single Phase General Service from Lumbee River Elec Member Corp is a tiered plan: the price per kWh steps up as monthly usage rises. The first tier is about $0.09/kWh; usage above the baseline allowance is billed at higher tiers.

Highest rate

10¢/kWh

Lowest rate

9¢/kWh

Fixed charge

$31.00/mo

Usage tiers

Tier Up to $/kWh
Tier 1 800 kWh $0.09
Tier 2 2200 kWh $0.09
Tier 3 no limit $0.08

Frequently asked questions

How do Lumbee River Elec Member Corp A-2: Single Phase General Service tiered rates work? +

A-2: Single Phase General Service from Lumbee River Elec Member Corp is a tiered plan: the price per kWh steps up as monthly usage rises. The first tier is about $0.09/kWh; usage above the baseline allowance is billed at higher tiers.

Who offers A-2: Single Phase General Service? +

A-2: Single Phase General Service is a residential electricity plan from Lumbee River Elec Member Corp (Lumbee River Elec Member Corp).

About this data

Compiled by Optiwatt from the OpenEI U.S. Utility Rate Database (63da8d3a69f03dd81006cbe0). Representative — verify exact prices on your Lumbee River Elec Member Corp bill or tariff sheet.

Other Lumbee River Elec Member Corp plans

Are you on the cheapest Lumbee River Elec Member Corp plan?

Ask the free Energy Advisor about A-2: Single Phase General Service, or upload a bill right here to check your real usage against every Lumbee River Elec Member Corp plan.

More free energy tools

Data last updated June 18, 2026. Compiled by Energy Advisor from published utility tariffs.