Energy Advisor
Menard Electric Coop · Tiered

How do Menard Electric Coop Geothermal, Farm And Residential Service (Rate Code 19S) tiered rates work?

Geothermal, Farm And Residential Service (Rate Code 19S) from Menard Electric Coop is a tiered plan: the price per kWh steps up as monthly usage rises. The first tier is about $0.12/kWh; usage above the baseline allowance is billed at higher tiers.

Highest rate

12¢/kWh

Lowest rate

12¢/kWh

Fixed charge

$29.00/mo

Usage tiers

Tier Up to $/kWh
Tier 1 1000 kWh $0.12
Tier 2 1300 kWh $0.10
Tier 3 no limit $0.10

Frequently asked questions

How do Menard Electric Coop Geothermal, Farm And Residential Service (Rate Code 19S) tiered rates work? +

Geothermal, Farm And Residential Service (Rate Code 19S) from Menard Electric Coop is a tiered plan: the price per kWh steps up as monthly usage rises. The first tier is about $0.12/kWh; usage above the baseline allowance is billed at higher tiers.

Who offers Geothermal, Farm And Residential Service (Rate Code 19S)? +

Geothermal, Farm And Residential Service (Rate Code 19S) is a residential electricity plan from Menard Electric Coop (Menard Electric Coop).

About this data

Compiled by Optiwatt from the OpenEI U.S. Utility Rate Database (539fbe33ec4f024c27d883f7). Representative — verify exact prices on your Menard Electric Coop bill or tariff sheet.

Are you on the cheapest Menard Electric Coop plan?

Ask the free Energy Advisor about Geothermal, Farm And Residential Service (Rate Code 19S), or upload a bill right here to check your real usage against every Menard Electric Coop plan.

More free energy tools

Data last updated June 18, 2026. Compiled by Energy Advisor from published utility tariffs.